RFPs and Proposals
Request for Proposals (RFP)
Architectural/Engineering and Estimation Services for Northwest Colorado Innovation Center
Issued By: Northwest Colorado Innovation Center
Contact: Christine Wong Rambo, Project Manager Email: christine@northwestcolorado.org
Issue Date: 4/30/2026
Deadline for Submission: Friday, May 15, 2026, by 5:00 PM (MT)
Email Proposals in a PDF format to Christine Rambo, Project Manager, at the email: christine@northwestcolorado.org with the Subject line: "RFP – Design/Engineering Services for Innovation Center"
Download the RFP Architectural/Engineering and Estimation Services for Northwest Colorado Innovation Center
Overview
Northwest Colorado Innovation Center (NCIC) is a 501c3 focused on diversifying the regional economy, providing workforce development, community development, and improving the quality of life of our people in Moffat, Rio Blanco, and Routt Counties. NCIC will build a 10,000 square foot Innovation Center at the new 25-acre Craig Business and Industrial Park campus in Craig, Colorado. The industrial park is located north of West 1st Street and west of Ranney Street at coordinates: 40.507593, -107.556557.
The Northwest Colorado Innovation Center is envisioned to be a 10,000 SF metal building with 25-foot ceiling heights, reinforced concrete floors, clear span, three offices, a conference room, bathrooms, a break room, and a large flex space to support industrial workforce training, entrepreneurial training, and small business development. The Innovation Center will anchor the industrial park, providing customized workforce training to the tenants locating at the park. We will also support workforce training for existing employers in order to reskill and upskill more than 1,000 coal transition workers who will soon be dislocated from their energy jobs.
NCIC is seeking professional design/engineering services to draft a Preliminary Engineering Report to be used as part of an application for a federal Economic Development Administration (EDA) grant. If NCIC is awarded the EDA grant, the selected design/engineering firm will also subsequently perform full design, engineering, bidding, and related A/E services to construct the project. NCIC encourages participation by minority-owned, women-owned, and disadvantaged business enterprises.
2. Scope of Work
We anticipate a two-phase approach. In phase 1, the architectural/engineering firm will work closely with NCIC staff and the Executive Committee to create a floor plan/schematics, provide detailed cost estimation, project schedule, and complete the Preliminary Engineering Report (PER) to be used as part of an application for an Economic Development Administration (EDA) grant. The budget for phase 1 is $45,000.
If NCIC is awarded the EDA grant, the selected A/E firm will also subsequently perform full design, engineering, bidding, and related A/E services to construct the Innovation Center. Phase 2 services may be negotiated with the selected firm, contingent upon funding and in accordance with federal procurement requirements and the Brooks Act.
Phase 1 Scope of Work:
Project drawings:
-
Identify and label existing conditions, such as existing infrastructure elements or structures within the EDA project construction limits.
-
Identify and label proposed project components with rough dimensions and general layouts.
-
Identify and label the location of any project beneficiaries identified in Section E.3 of the Form ED-900GA, if applicable. (color coding, labeling, legends, and keyed notes are encouraged)
Construction cost estimate:
-
Provide a detailed construction cost estimate in terms of quantities, unit prices, and total costs for all the EDA project components.
-
Provide a basis for the determination of construction contingencies.
-
If separate contracts are anticipated for demolition or site work, provide a separate detailed cost estimate for these components.
-
If demolition or site work will not be separate contracts, include the costs in the overall detailed construction cost estimate.
Project constraint:
-
Describe any design and construction constraints for the proposed project.
Recommend the proposed method of construction procurement:
-
Identify if the project will be a traditional design/bid/build with a sealed competitive bid process consistent with federal procurement guidelines
-
Identify if any portion of the project is to be done by an alternate construction procurement method, such as design/build, construction management at risk, the applicant's own forces, and/or a construction manager.
Number of construction contracts anticipated:
-
Identify the number of construction contracts anticipated and provide a description of the project components for each contract
Project permits:
-
List permits required for the proposed project.
-
Provide the timeline to obtain the permits and their current status.
-
Permits should include, but are not limited to:
-
Clean Water Act Section 404 permits
-
NPDES permits, including stormwater permits, railroad permits, highway encroachment, etc. CIII.8.
-
Project schedule:
-
Provide the following proposed project schedule in terms of months.
-
A/E procurement, if applicable;
-
design period
-
period of time to obtain the required permits
-
period of time to obtain any required easements, rights-of-way, or other real property rights needed for the project (including permits or licenses needed for entering land owned by a third party)
-
solicitation of bids
-
awarding of contracts
-
construction period
-
The scope of work includes, but is not limited to, the following A/E services:
-
Create full construction drawings, plans, and specifications
-
Other related design/engineering services as needed during the preconstruction and construction phase
3. Timeline
4. Proposal Requirements
-
Firm Overview: History, size, location(s), and areas of specialization.
-
Relevant Experience: Examples of similar rural innovation centers or workforce training projects
-
Approach: Narrative explaining your design approach and process.
-
References: At least three references from recent comparable projects.
-
Certification: Proposers must certify they are not debarred or suspended from federal contracting.
5. Submission Instructions
Proposals must be submitted to Christine Rambo via email: christine@northwestcolorado.org by May 15, 2026, 5 PM MT with the subject line: RFP – Design/Engineering Services for Innovation Center.
Submissions must be in PDF format.
Time of Receipt & Confirmation: The NCIC email server timestamp is the official time of receipt. Late submissions will not be accepted. We will confirm receipt; if confirmation is not received within 2 hours, the proposer is responsible for follow-up. Unconfirmed submissions are considered not received.
Proposals will be received in a secure, restricted inbox and will not be opened until after the deadline. A submission log will be maintained to ensure fairness and compliance with 2 CFR 200.
NCIC is not responsible for failed transmissions, spam filtering, or file issues. Proposers should submit early and follow up if an email confirmation is not received. You can also call Christine Rambo at 318.557.0609
6. Evaluation Criteria
Proposals will be evaluated based on the following:
7. Questions and Clarifications
All questions must be submitted in writing by Friday, May 8, 2026 to:
Christine Rambo, CEcD, MBA, Project Manager via email: christine@northwestcolorado.org
Pre-proposal Meeting will be held via Zoom on Friday, May 8, 2026 at 9 AM MT
Join Zoom Meeting: https://us02web.zoom.us/j/88383629244?pwd=LRA3sUXR0RUiwm0JinMVA4x1XX41DH.1
Meeting ID: 883 8362 9244, Passcode: 526381
One tap mobile
+13017158592,,88383629244#,,,,*526381# US (Washington DC)
+13052241968,,88383629244#,,,,*526381# US
Join by SIP
88383629244@zoomcrc.com
The Preproposal Meeting will be recorded and shared upon request. Responses to questions will be shared with all known proposers and on northwestcolorado’s website.
8. Anticipated Timeline
9. Contracting
10. Rights Reserved